New Energy Campus Reception Center

Wuhan
Arquitectos
Zephyr Architects
Ano
2013

The reception center was conceived as a main landmark for Guanggu New Energy campus.  It serves as the preeminent arrival point to the site as well as a gateway to the lake.  The building is formed by two long bars peeling away from each other and opening out to the lake.  A long covered walkway connects the bars and leads the people to the lake.  The first floor contains exhibition space and a cafeteria, and the second floor houses more private/administrative functions like offices and conference rooms.  The triangular covered outdoor space formed between the two parts can be used for various activities.  The building mass is made to slowly emerge out of the landscape making it a part of the landscape.  The entire site is articulated with long flowing walls making the building an integral part of the landscape. The longer sides of the building are north-south orientated to reduce the energy load.

Status: CD completed

Building Area: 5,000 sq.m.

Principal-in-Charge: Ekaggrat singh kalsi

Project Team: Ekaggrat singh kalsi, Sun Yuan

Design Period: 2011

Construction Period: 2012-2013

Projetos relacionados

  • Gebäudeadaptierungen Rathausbereich - Zwentendorf
    maul-architekten zt gmbh
  • FON - Wohnbau und Kindergarten Fontanastraße
    GERNER GERNER PLUS
  • GOLD - Wohnbau Goldberg
    GERNER GERNER PLUS
  • BENE - Wohnbau Benedikt
    GERNER GERNER PLUS
  • PUCH - Wohnbau Puchsbaumgasse
    GERNER GERNER PLUS

Revista

Outros projetos por Zephyr Architects

Pool at Fragrant Hill
Beijing
Science Valley Office & Clubhouse
Langfang
Bio-Lake Reception Center
Wuhan
Wuyuan Hotel and Resorts
Jiangxi
Humanwell Group Headquarter
Wuhan