Shanghai Oriental Hosptial

Shanghai
Architects
Lemanarc SA
Any
2018
Equip
Lemanarc SA

The penetration of garden elements in all parts of the building is an inherent requirement for creating a gardening space. In this project, the traditional garden concept was dismantled into several garden systems covering the entire hospital. These systems, while realizing the functions of greening, sound insulation and shading, also turn the hospital into a self-contained medical village.

Projectes relacionats

  • Bærum Cultural Center
    Snøhetta
  • Museum of Inuit Art
    gh3
  • Russell Hill Road
    gh3
  • House 60
    gh3
  • Bibliothek der Hochschule für Technik und Wirtschaft
    HerbstKunkler Architekten

Revista

Altres projectes per Lemanarc SA

Nanjing Drum Tower Hospital
Nanjing
Xiamen Wuyuan Bay Hong'ai Hospital
Xiamen
Construction of a cycle of orientation in fully
Fully, Switzerland
Xiamen Nanyang College
Xiamen
Different mixe housing,commercial center and services sous-le-bourg a aigle
Aigle, Switzerland